Loading bridge failure at the Burchardkai terminal, Hamburg

14. July 2025 | Operative Infos

Restriction of rail traffic

We want to inform you about the current situation and effects.

 

Important updates

  • Hamburg Terminal Burchardkai reports the failure of a loading bridge. Damage repair is expected by probably Tuesday, 15.07.2025, 3:00 p.m. The backlog is approximately 7 hours.
  • Due to refusal of acceptance, export train had to be parked in Klein Süstedt, delayed onward travel took place this morning.
  • As are result, delays are to be expected, train cancellations cannot be ruled out.

Delivery times or fixed dates cannot be guaranteed; these require unhindered transport by rail or road traffic.

As a precaution, we would like to point out that ROLAND Spedition accepts no liability for costs resulting from these events. Your contact person will be happy to answer any questions you may have about your transports.

Contact

Roland Spedition GmbH
Email: office@rolsped.com
Concorde Business Park 1/B2/32
A-2320 Schwechat

T: +43 1 728 37 43

F: +43 1 720 22 40

Terminalstraße 2
A-5071 Wals

T: +43 662 854 351

F: +43 662 854 169