Railroad track barrier from 27.08.2016 to 11.09.2016 between Mixnitz – Bkl and Graz Vbf

eugenOperational

Referring to the information of ÖBB-Infrastruktur rail traffic will be suspended during the above mentioned pediod of time between the Bf. Mixnitz and Peggau section. Due to that the trains of ROLAND SPEDITION ex Enns – Graz v.v. will be unfortunately cancelled in CW 35 and CW 36.

Last train departs on 25.08.2016 and we will be able to return to normal operation as of 15.09.2016.

We regret any inconvenience this may cause you and which are beyond our control. Please take these delays into account regarding to your planning. Your contact person at ROLAND SPEDITION will keep you informed about the status of your transport. Please note that ROLAND SPEDITION does not assume any liability for costs resulting of this problems.

Kind regards
ROLAND Spedition